What have we built over the years? Here are just a few of our projects. Select a category in the menu below to view samples of our work. Click on any image for a magnified view.
What have we built over the years? Here are just a few of our projects. Select a category in the menu below to view samples of our work. Click on any image for a magnified view.
As a second phase of a facility expansion project, ESI added a new 30' x 20' x 14' deep truck receiving pit with a fully-integrated 20,000 CFM dust system and fully enclosed building.The new pit includes six dust pickups, a ladder gate including 4 openings along with an Andco actuator allowing for percentage control of the inbound grain flow. The hopper feeds a pair of 20,000 BPH Hawthorne-Seving drag conveyors that transfer grain to a 20,000 BPH Hawthorne-Seving receiving leg (constructed during phase I of the project).
Our customer was seeking ways to increase the speed and capacity of their inbound grain receiving capabilities. ESI proposed enlarging an existing grain receiving pit that previously could only handle one trailer unload gate at a time with a new, larger grate and pit to accommodate both trailer gates. This new pit greatly reduces the time needed to unload a grain trailer resulting in shorter truck lines and wait times for the cooperative's customers.
This grain operation handles high volumes of grain and multiple commodities. To accommodate both requirements, ESI designed and installed a 12' x 24' grain receiving pit with an oversized hopper that holds approximately 1,000 bushels of grain. With the large grate and hopper a truck can dump its entire load into the pit without running the receiving conveyor. This allows the grain elevator to switch between commodities without holding up the truck line.
Another critical requirement was the need for dust collection. This projects includes baffles below the pit grate and a Donaldson dust filter with dust pickups mounted to the hopper's sidewall. To prevent grain from being pulled into the dust pickups, ESI installed perforated deflector plates covering the dust openings.
The entire receiving pit is covered with a Golden Giant building and includes an attached separate control room.
As this customer's facility continued to expand, so did their need for increased grain receiving capacity. ESI designed and installed this 20,000 BPH receiving pit along with a 25,000 CFM dust filter.